Skip to content
  • New: asasii S2 handheld barcode scanner. 1D and 2D, IP52 rated.View S2
  • asasii POS is live and deploying to Malaysian retailers.See asasii POS
  • asasii BSC: supply chain software for multi-outlet operators.See asasii BSC
  • Browse the full asasii hardware line: terminals, printers, scanners, payment, drawers.View hardware
idataraya
idataraya

Test.

We don't ship until it survives real conditions.

Every build goes through acceptance testing, integration testing, and hardware burn-in before it leaves our environment. We simulate outage, load, and edge conditions that match the customer's real environment, and we don't mark the phase complete until the customer signs off on the acceptance criteria.

Test Run · Release 2026-04-18
87 / 88 passing
87 pass1 fail0 skippedTotal · 17m 03s
Acceptance · POS checkout
42 pass
2m 14s
Integration · ERP sync
28 pass
47s
Load · 50 concurrent counters
16 pass1 fail
6m 02s
Hardware · printer burn-in 8h
1 pass
8h
Printer burn-in · 8h
No faults · paper advance 100%
Customer sign-offPending · 1 retry on load
Rollout · Cohort 1
2 live · 1 installing · 1 queued
StoresDevicesTrainingGo-live window · 2026-04-18
KL-01Flagship · Pavilionlive
Live · 09:12
KL-02KLCC · L4live
Live · 10:38
KL-03Mid Valleyinstalling
Provisioning
PJ-011 Utamaqueued
Scheduled · 14:00
Go-live checklist
  • Devices provisioned · 22 of 22
  • Network validated at counter
  • ERP handshake confirmed
  • End-to-end txn validated
  • Staff training · handover
Live Operations · Multi-outlet retail
14 sites · 22 devices
Uptime 99.98%1 incident · resolvedOn-call · S. Kumar
p95 latency
142ms
Txn / min
318
Error rate
0.02%
p95 · last 2h
Event stream · /api
09:14:22200/api/txn · KL-01
09:14:18200/api/txn · KL-02
09:13:41503/api/erp-sync · retry 1
09:13:42200/api/erp-sync · recovered
09:12:08200/health · all stores
Scope Charter
v1.0 · Signed
ScopeStakeholdersTimelineApproved
Project
Multi-outlet POS rollout · 14 stores
Objectives
  • Unified POS across all outlets
  • Live inventory sync to ERP
  • Daily sales dashboard by store
Out of scope
Loyalty, ecommerce sync
Success criteria
< 2s txn · 99.9% uptime
Ops lead · R. HassanIT · M. TanFinance · A. Kumar
SignedR. Hassan2026-04-12

What test delivers.

The concrete outputs every engagement carries out of this phase before the next one starts.

Acceptance and integration testing

Every release runs the full acceptance suite end to end: payment flows, returns, shift reconciliation, sync recovery. Playwright covers the UI, contract tests cover the APIs, and an engineer signs off on the evidence before we tag the build.

Test Run · Release 2026-04-18
87 / 88 passing
87 pass1 fail0 skippedTotal · 17m 03s
Acceptance · POS checkout
42 pass
2m 14s
Integration · ERP sync
28 pass
47s
Load · 50 concurrent counters
16 pass1 fail
6m 02s
Hardware · printer burn-in 8h
1 pass
8h
Printer burn-in · 8h
No faults · paper advance 100%
Customer sign-offPending · 1 retry on load

Hardware burn-in and load simulation

Units are run through a thermal and power-cycle burn-in rig before they leave the office. Peak-hour load is simulated against the production topology, a full outlet on a payday Saturday, to surface bottlenecks before a live queue does.

Rollout · Cohort 1
2 live · 1 installing · 1 queued
StoresDevicesTrainingGo-live window · 2026-04-18
KL-01Flagship · Pavilionlive
Live · 09:12
KL-02KLCC · L4live
Live · 10:38
KL-03Mid Valleyinstalling
Provisioning
PJ-011 Utamaqueued
Scheduled · 14:00
Go-live checklist
  • Devices provisioned · 22 of 22
  • Network validated at counter
  • ERP handshake confirmed
  • End-to-end txn validated
  • Staff training · handover

Customer acceptance sign-off required

The phase closes when the customer, not us, signs the acceptance document against the criteria agreed in Plan. Outstanding defects are listed, severity-ranked, and either fixed pre-launch or scheduled into a post-launch window.

Live Operations · Multi-outlet retail
14 sites · 22 devices
Uptime 99.98%1 incident · resolvedOn-call · S. Kumar
p95 latency
142ms
Txn / min
318
Error rate
0.02%
p95 · last 2h
Event stream · /api
09:14:22200/api/txn · KL-01
09:14:18200/api/txn · KL-02
09:13:41503/api/erp-sync · retry 1
09:13:42200/api/erp-sync · recovered
09:12:08200/health · all stores

Security review and data protection audit

Auth flows, role permissions, data encryption at rest and in flight, and audit logging are reviewed before anything touches production. PII handling, retention policies, and access controls are documented and signed off, so compliance is evidenced, not assumed.

Scope Charter
v1.0 · Signed
ScopeStakeholdersTimelineApproved
Project
Multi-outlet POS rollout · 14 stores
Objectives
  • Unified POS across all outlets
  • Live inventory sync to ERP
  • Daily sales dashboard by store
Out of scope
Loyalty, ecommerce sync
Success criteria
< 2s txn · 99.9% uptime
Ops lead · R. HassanIT · M. TanFinance · A. Kumar
SignedR. Hassan2026-04-12

The other six phases.

Every engagement runs through all seven, end to end. Same team, same process, every time.

Run the full seven with us.

Every idataraya engagement runs all seven phases end to end. Book a discovery call and we will walk through how we would approach your project.